[CRITICAL] Process Cooling Water Back Online
Physics facility information via facility_info
facility_info at lists.osu.edu
Thu Nov 7 15:25:43 EST 2019
Process cooling water is back online and normal pressures and flows have resumed.
Root cause was a control issue related to the automatic switch over of pumps between the lead pump and the stand-by pump which is offline for repairs.
This condition has been manually over-ridden and will be returned to full automation when the stand-by pump repairs are completed.
Labs may resume normal activities.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.osu.edu/pipermail/physics-staff-df/attachments/20191107/a733cc19/attachment.html>
-------------- next part --------------
_______________________________________________
facility_info mailing list
More information about the physics-staff-df
mailing list