[ALERT] Air Handler 2 - Lab Side - North End - Reduced to 50% for Louver Installation
Physics facility information
facility_info at groups.asc.ohio-state.edu
Tue Feb 5 10:44:27 EST 2013
As previously announced, work crews preparing the new area well for louver installation require air flow to AHU-2 be reduced by 50%.
This flow reduction action will take place this morning at approx 11:00 am.
One of the six main exhaust fans will also be shut down to minimize building pressure imbalances.
Fume hoods are expected to remain in normal function.
A follow up announcement will be made when the unit is back at 100% and/or when additional air outages are required for the installation.
There are four louvers to install in total for this project.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.osu.edu/pipermail/physics-staff-df/attachments/20130205/ae21574e/attachment.html>
-------------- next part --------------
_______________________________________________
FACILITY_INFO mailing list
More information about the physics-staff-df
mailing list