[Marstudent] Science & Engineering Building ribbon cutting today

Rowe, Wayne rowe.31 at osu.edu
Tue Aug 1 08:00:51 EDT 2017


Ohio State Marion dedicates new Science & Engineering Building
August 1st opening seen as transformative for the campus, and science and engineering education

The Ohio State University at Marion welcomes the campus community, alumni, donors, the media, and the general public to the official ribbon cutting and dedication ceremony of their new 32,000 square foot Science and Engineering Building, Tuesday, August 1, 2017 at 9:30 a.m. on the Marion campus.

Following the welcome and introductions by Dean and Director, Gregory S. Rose, Computer Science and Engineering major Ruksana Kabealo of Marysville, Ohio, will give the student perspective on the new facility.  President of The Ohio State University, Dr. Michael Drake will then address those in attendance.  Tours of the new building will be open to the public from 10 a.m. until 12 noon.

The building, which opens for classes during the upcoming autumn semester, features research labs for faculty in each discipline, faculty/student collaboration spaces, and new biology, chemistry, earth science, engineering, and teaching labs.  In addition, a special time walk throughout the building traces earth's history, and mammoth bones excavated by campus faculty and students in 1976 are also on permanent display.

According to Dean and Director, Gregory S. Rose, the building moves Ohio State Marion forward in a transformative way.  "It will support our 4 year biology degree program, more courses in the engineering curriculum, and vastly improve facilities for science courses taken by all students this coming semester and well into the future," said Rose.

Donors to the $15.5 million project will be honored for their investment in STEM education.  The Science and Engineering Building is the 8th free standing building constructed on the Marion campus.  Science labs and classrooms were previously located on the third floor of Morrill Hall, which opened in 1968.   Campus administration anticipates remodeling and repurposing Morrill Hall's third floor in summer 2018.

The Science and Engineering Building is equipped with a host of sustainability features, such as:  on-demand lighting, computer controlled greenhouse, white roof for energy efficiency, four electric vehicle charging stations, heat recovery from fume hoods and HVAC, and solar panels that will provide 2-3% of the facilities electricity. All waste materials from construction of were recycled.  Ohio State Marion has applied for LEED Silver certification.
The building construction manager was Ruscilli Construction.  Ruscilli reported 100% accident free days during construction.  Locally sourced brick comes from Glen-Gary Corp., in Iberia, Ohio.  The architectural firm responsible design is Stantec Architects.




[The Ohio State University]
Wayne Rowe
Director of Communications & Marketing
The Ohio State University at Marion
Office of Communications & Marketing
245C Maynard Hall, 1465 Mount Vernon Avenue, Marion, OH 43302
740-725-6316 Office / 740-360-4351 Mobile
rowe.31 at osu.edu<mailto:rowe.31 at osu.edu> Email /  osumarion.osu.edu<http://osumarion.osu.edu/> Web
https://www.facebook.com/osumarion Facebook

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.osu.edu/pipermail/marstudent/attachments/20170801/a9c64bae/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 3605 bytes
Desc: image001.png
URL: <http://lists.osu.edu/pipermail/marstudent/attachments/20170801/a9c64bae/attachment.png>


More information about the Marstudent mailing list