<html xmlns:v="urn:schemas-microsoft-com:vml" xmlns:o="urn:schemas-microsoft-com:office:office" xmlns:w="urn:schemas-microsoft-com:office:word" xmlns:m="http://schemas.microsoft.com/office/2004/12/omml" xmlns="http://www.w3.org/TR/REC-html40">
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
<meta name="Generator" content="Microsoft Word 15 (filtered medium)">
<style><!--
/* Font Definitions */
@font-face
        {font-family:"Cambria Math";
        panose-1:2 4 5 3 5 4 6 3 2 4;}
@font-face
        {font-family:Calibri;
        panose-1:2 15 5 2 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
        {margin:0in;
        margin-bottom:.0001pt;
        font-size:11.0pt;
        font-family:"Calibri","sans-serif";}
a:link, span.MsoHyperlink
        {mso-style-priority:99;
        color:#0563C1;
        text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
        {mso-style-priority:99;
        color:#954F72;
        text-decoration:underline;}
span.EmailStyle17
        {mso-style-type:personal-compose;
        font-family:"Calibri","sans-serif";
        color:windowtext;}
.MsoChpDefault
        {mso-style-type:export-only;
        font-family:"Calibri","sans-serif";}
@page WordSection1
        {size:8.5in 11.0in;
        margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
        {page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext="edit" spidmax="1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext="edit">
<o:idmap v:ext="edit" data="1" />
</o:shapelayout></xml><![endif]-->
</head>
<body lang="EN-US" link="#0563C1" vlink="#954F72">
<div class="WordSection1">
<p class="MsoNormal">Quarterly PM (planned maintenance) on the PRB’s four air handler units and six connected exhaust fans will be conducted by FOD on Saturday, April 5<sup>th</sup> 2014.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">This is a scheduling change point from the planned date of Wednesday April 9<sup>th</sup> and is made to align quarterly PM work with previously planned work to replace fan pulleys on AHU-1 and AHU-2.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Maintenance is scheduled to start at 7:00 AM and is planned to be completed by no later than 3:00 PM.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Because the lab side air handlers and connected exhaust fans will be shut down, fume hood operations should be suspended for the full maintenance period.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Occupants are reminded that although the building will remain open and accessible, air flows and other air-related building processes will be impacted throughout the day as maintenance is done.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">In addition to normal PM activities, fan pulleys will be replaced with new sized pulleys designed to reduce overall system static pressure on both AHU-1 and AHU2.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Individual lab pressure controls are expected to remain unchanged and automatically compensate for the system static pressure change.  Occupants should report instances where lab pressure may need adjusted.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Please take planned action to prepare for this event.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Key Summary Points:<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">- Air handler / Exhaust Fan shut down Wednesday, January 8th.<o:p></o:p></p>
<p class="MsoNormal">- No building closure or evacuation<o:p></o:p></p>
<p class="MsoNormal">- Suspend fume hood operations<o:p></o:p></p>
<p class="MsoNormal">- Building air flow and air-related processes will be interrupted throughout the day<o:p></o:p></p>
<p class="MsoNormal">- Performance modification – reduce static pressure by replacing fan pulley on AHU-1 and AHU-2<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">For long range planning purposes, the 2014 quarterly maintenance dates are planned as follows:<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Q1-2014 = January 9th Wednesday - Complete<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Q2-2014 = April 5<sup>th</sup> Saturday (changed from April 9<sup>th</sup>) - Announced<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Q3-2014 = July 9th Wednesday - Planned<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Q4-2014 = October 8th Wednesday – Planned<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">This message is Notice 1 of 3 of such alerts<o:p></o:p></p>