<html xmlns:v="urn:schemas-microsoft-com:vml" xmlns:o="urn:schemas-microsoft-com:office:office" xmlns:w="urn:schemas-microsoft-com:office:word" xmlns:m="http://schemas.microsoft.com/office/2004/12/omml" xmlns="http://www.w3.org/TR/REC-html40">
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
<meta name="Generator" content="Microsoft Word 15 (filtered medium)">
<style><!--
/* Font Definitions */
@font-face
        {font-family:"Cambria Math";
        panose-1:2 4 5 3 5 4 6 3 2 4;}
@font-face
        {font-family:Calibri;
        panose-1:2 15 5 2 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
        {margin:0in;
        margin-bottom:.0001pt;
        font-size:11.0pt;
        font-family:"Calibri","sans-serif";}
a:link, span.MsoHyperlink
        {mso-style-priority:99;
        color:#0563C1;
        text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
        {mso-style-priority:99;
        color:#954F72;
        text-decoration:underline;}
span.EmailStyle17
        {mso-style-type:personal-compose;
        font-family:"Calibri","sans-serif";
        color:windowtext;}
.MsoChpDefault
        {mso-style-type:export-only;}
@page WordSection1
        {size:8.5in 11.0in;
        margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
        {page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext="edit" spidmax="1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext="edit">
<o:idmap v:ext="edit" data="1" />
</o:shapelayout></xml><![endif]-->
</head>
<body lang="EN-US" link="#0563C1" vlink="#954F72">
<div class="WordSection1">
<p class="MsoNormal">An abbreviated Quarterly PM (planned maintenance) cycle will be conducted by FOD on Wednesday, July 9th 2014.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">This is a scheduling change point from the planned full maintenance cycle for this date made necessary by upcoming work for the Energy Conservations Measures (ECM) project.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Activities for this abbreviated campaign will be limited to the following:<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   1.) AHU-1: Brief shutdown to check belt tensions<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   2.) AHU-2: Shutdown to check belt tensions and to complete warranty repair on epoxy coating applied under the recently completed AIR-3R project.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   3.) Process Cooling Water: Additional Load testing for East Regional Chiller Plant commissioning.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   4.) Process Cooling Water:  Brief shutdown of pumps to clean and flush strainers<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   5.) Emergency Generator Load Testing – (no Automatic Transfer Switch testing)<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Maintenance is scheduled to start at 7:00 a.m. and is planned to be completed by no later than 9:30 a.m. for the Air Handlers and 12:00 noon for the PCW load testing.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">All other routine PM activities not listed above will be deferred to a multi-day outage needed for the ECM project tentatively planned for the weekend of August 9th.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Please take planned action to prepare for this abbreviated event.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Key Summary Points:<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   - Abbreviated Scope of Work<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   - Air handler / Exhaust Fan shut down Wednesday, July 9th.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   - Suspend fume hood operations<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   - Building air flow and air-related processes will be interrupted<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   - Process cooling water flow will be interrupted briefly for strainer flush and clean.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   - Process cooling water temperature may increase during East Regional Chiller Plant load testing.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">   - Emergency Generator load testing with no automatic transfer switch
<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">For long range planning purposes, the 2014 quarterly maintenance dates are planned as follows:<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">Q1-2014 = January 9th Wednesday - Complete<o:p></o:p></p>
<p class="MsoNormal">Q2-2014 = April 5th Saturday - Complete<o:p></o:p></p>
<p class="MsoNormal">Q3.1-2014 = July 9th Wednesday – Announced – abbreviated scope<o:p></o:p></p>
<p class="MsoNormal">Q3.2-2014 = August 9-10 – tentative date includes remaining PM scope plus ECM work<o:p></o:p></p>
<p class="MsoNormal">Q4-2014 = October 8th Wednesday – Planned<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal">This message is the final notice for this event.<o:p></o:p></p>